4D BIM - Construction Scheduling

Accurate and Step-by-Step Visuals of the Project Development

We provide 4D BIM Schedule that includes all the time-related data of a project’s development, showing how it will be constructed and how both the structure and site surroundings will appear at each stage. 4D BIM incorporates the start and finish date data for the supply and installation of construction components and reveals the importance of them to the overall project. Our 4D BIM Schedule will project all the construction schedules which will help to negate last-minute on-site design coordination and rework, ultimately eliminating waste from the delivery process and speeding it up.

Project planners and teams can use 4D BIM Scheduling as it not only gives the overall project simulation but for a specific element or work area, it could also include details like lead time, construction and installation period, sequencing or dependency with other areas, curing and drying allowance and other interdependencies. With the 4D BIM in place, project teams- owners, planners, architects, engineers, contractors, etc. can streamline the cost base of the project and increase their capacity, whilst reducing overall delivery costs for clients. Also, 4D Construction Scheduling provides the bidders with bid documents based on the coordinated model that can be constructed within the scheduled timeframe barring unforeseen changes.

Benefits of 4D BIM Services

Image
Image
  • Provides fast and accurate feedback on timescales and methodologies
  • Provides a clear impression of how the asset will appear, rather than having to envisage that from plans or Gantt charts
  • Improved lead time identification which can reduce total construction duration
  • It is powerful tool for communicating the impact of built assets
  • Reduces overall delivery costs for clients
  • Enhances coordination and eliminates rework
  • Provides rapid feedback on design or methodology changes to the teams